Using the value flow mapping tool (MFV) to identify waste in the production process of a gypsum manufacturing company

Authors

  • Pedro Vieira Souza Santos UNIVERSIDADE FEDERAL DO VALE DO SÃO FRANCISCO - UNIVASF
  • Andréa de Vasconcelos Ferraz UNIVERSIDADE FEDERAL DO VALE DO SÃO FRANCISCO - UNIVASF
  • Ana Cristina Gonçalves Castro Silva UNIVERSIDADE FEDERAL DO VALE DO SÃO FRANCISCO - UNIVASF

DOI:

https://doi.org/10.14488/1676-1901.v19i4.3310

Keywords:

Value Stream Mapping. Lean Manufacturing. Gypsum Industry.

Abstract

The industries of the gypsum segment, due to the high production volume, represent a sector of great economic importance and that needs studies that visualize the efficiency of the production system. Thus, using the Value Stream Mapping (MFV) tool, the study was able to answer the defined problem, namely, what are the probable wastes and bottlenecks that the value stream mapping can help to identify in a company of gypsum sector. Based on time studies (chronoanalysis), it was observed that the calcination operation is the bottleneck of the production system, presenting a Standard Time of 6338.5 s, which represents approximately 55% of the total processing time for a batch with an average of 95 bags of 40 kg each. Thus, it is emphasized the importance of studying the calcination process, indicated as bottleneck process, from the observation of the high cycle time in relation to the takt time, which results in an imbalance in the rhythm to meet the demand.

Downloads

Download data is not yet available.

Author Biographies

Pedro Vieira Souza Santos, UNIVERSIDADE FEDERAL DO VALE DO SÃO FRANCISCO - UNIVASF

Engenheiro de Produção.

Graduação em Engenharia de Produção.

Andréa de Vasconcelos Ferraz, UNIVERSIDADE FEDERAL DO VALE DO SÃO FRANCISCO - UNIVASF

Possui mestrado em Química e Biotecnologia pela Universidade Federal de Alagoas e doutorado em Ciência dos Materiais pela Universidade Federal de Pernambuco (2007). Atualmente é professor adjunto da Universidade Federal do Vale do São Francisco. 

Ana Cristina Gonçalves Castro Silva, UNIVERSIDADE FEDERAL DO VALE DO SÃO FRANCISCO - UNIVASF

Docente do Colegiado de Engenharia de Produção da Universidade Federal do Vale do São Francisco (UNIVASF) e avaliadora do sistema nacional de avaliação do ensino superior do Ministério da Educação (MEC/INEP). Doutora em Engenharia Industrial pela Universidade Federal da Bahia (UFBA). Mestre em Engenharia Mecânica [2008 - Universidade Federal de Pernambuco - UFPE]. Engenheira de produção mecânica [2004 - Faculdades Integradas Ipitanga em parceria com o SENAI] e Técnica em refrigeração e ar condicionado [1998 - CEFET/PE].

References

AOMAR, R. A. Handling multi-lean measures with simulation and simulate dannealing. Journal the Franklin Institute, v. 348, n. 7, p. 1506-1522, 2011. https://doi.org/10.1016/j.jfranklin.2010.05.002

AYENI, P.; BAINES, T.; LIGHTFOOT, H.; BALL, P. State-of-the-art of ‘Lean’ in the aviation maintenance repair, and overhaul industry, Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, v. 225, n. 11, p. 2108-2123, 2011. https://doi.org/10.1177/0954405411407122

BALTAR, C. A. M.; BASTOS, F. F.; LUZ, A. B. Diagnóstico do pólo gesseiro de Pernambuco (Brasil) com ênfase na produção de gipsita para fabricação de cimento. Pernambuco, 2004.

BALZER, W.K.; BRODKE, M.H.; KIZHAKETHALACKAL, T. E. Lean higher education: successes, challenges, and realizing potential. International Journal of Quality & Reliability Management, v. 32, n. 9, p.924-933, 2015. https://doi.org/10.1108/IJQRM-08-2014-0119

BARNES, R. M. Estudo de tempos e movimentos: projeto e medida do trabalho. Tradução de Sergio Luis Oliveira Assis, José S. Guedes Azevedo e Arnaldo Pallota. 6. ed. São Paulo: Edgard Blücher, 1977.

BASTOS, F. F.; BALTAR, C. A. M., Avaliação dos processos de calcinação para produção de gesso Beta. In: CONGRESSO BRASILEIRO DE QUÍMICA, 43., 2003. [Anais...]. Minas Gerais, 2003.

BELLISARIO, A.; PAVLOV, A. Performance management practices in lean manufacturing organizations: a systematic review of research evidence, Production Planning & Control, v. 29, n. 5, p. 367-385, 2018. https://doi.org/10.1080/09537287.2018.1432909

CALDERA, H.T.S.; DESHA, C.; DAWES, L. Exploring the role of lean thinking in sustainable business practice: A systematic literature review. Journal of Cleaner Production, v. 167, p. 1546–1565, 2017. https://doi.org/10.1016/j.jclepro.2017.05.126

CHEN, J.C.; COX, R.A. Value stream management for lean office - a case study. American Journal of Industrial and Business Management, v. 2, p. 17-29, 2012. https://doi.org/10.4236/ajibm.2012.22004

CORRÊA, H. L.; CORRÊA, C. A. Administração de produção e operações – manufatura e serviços: uma abordagem estratégica. 3. ed. São Paulo: Editora Atlas S.A., 2012.

DE JONG, S. J.; BEELAERTS VAN BLOKLAND, W. W. A. Measuring lean implementation for maintenance service companies. International Journal of Lean Six Sigma, v. 7, n. 1, p. 35–61, 2016. https://doi.org/10.1108/IJLSS-12-2014-0039

DENNIS, P. Produção lean simplificada. Porto Alegre: Bookman, 2008.

DINESH, S.; NITIN, S.; PRATIK, D. Application of Value Stream Mapping (VSM) for lean and cycle time reduction in complex production environments: A case study. Production Planning & Control, v. 28, p. 398–419, 2017. https://doi.org/10.1080/09537287.2017.1300352

DOUGLAS, J.; ANTONY, J.; DOUGLAS, A. Waste identification and elimination in HEIs: the role of Lean thinking, International Journal of Quality & Reliability Management, v. 32, n. 9, p. 970-981, 2015. https://doi.org/10.1108/IJQRM-10-2014-0160

FOLLNER, S.; WOLTER, A.; PREUSSER, A.; INDRIS, S.; SILBER, C.; FOLLNER, H. The Settings Behavior of Beta– and Alpha-CaSO4 x 0,5 H2O as Function of Crystal Structure and Morphology. Crystal Research Technology, v. 37, n. 10, p. 10075- 1087, 2002. https://doi.org/10.1002/1521-4079(200210)37:10<1075::AID-CRAT1075>3.0.CO;2-X

GANGA, G. M. D. Trabalho de conclusão de curso (TCC) na engenharia de produção: um guia prático de conteúdo e forma. São Paulo: Atlas, 2012.

GIL, A. C. Como elaborar projetos de pesquisa. 4. ed. São Paulo: Atlas, 2002.

GIL, A. C. Como elaborar projetos de pesquisa. 5. ed. São Paulo: ATLAS, 2010.

GILL, P.S. Application of value stream mapping to eliminate waste in an emergency room. Journal Global Journal of Medical Research, v. 12, p. 51-56, 2012.

IAMMARINO, S.; MCCANN, P.; ORTEGA-ARGILÉS, R. International business, cities and competitiveness: recent trends and future challenges, Competitiveness Review: An International Business Journal, v. 28:3, p.236-251. 2018. https://doi.org/10.1108/CR-10-2017-0070

IKATRINASARI, Z. F.; HARYANTO, E. I. Implementation of lean service with value stream mapping at directorate airworthiness and aircraft operation, ministry of transportation republic of indonesia. Journal of Service Science and Management, v. 7, p. 291-301, 2014. https://doi.org/10.4236/jssm.2014.74026

JOHN, V. M.; CINCOTTO, M. A. Gesso de construção civil. In: ISAIA, G. C. Materiais de construção civil. São Paulo: Ibracon, 2007. p. 727-760.

KARUNAKARAN, S. Innovative application of LSS in aircraft maintenance environment. International Journal of Lean Six Sigma, v. 7, n. 1, p. 85–108, 2016. https://doi.org/10.1108/IJLSS-01-2015-0001

LIKER, J. K.; MÉIER, D. O Modelo Toyota: Manual de aplicação. Porto Alegre: Bookman, 2007.

LIRA, A. C. P. L.; AMARAL, A. J. R.; DANTAS, J. O. C.; DANTAS, J. R. A. Gipsita: balanço mineral brasileiro. DNPM/PE, 2001.

MALHOTRA, N. Pesquisa de marketing. 3.ed. Porto Alegre: Bookman, 2001.

MARCONI, M. A. LAKATOS, E. M. Metodologia científica. 5. ed. São Paulo: Atlas, 2011.

MARTINS, P. G. LAUGENI, F. P. Administração da produção. São Paulo: Saraiva, 2006.

MENG, T.; HU, Y.; FANG, R. Study of fracture toughness and weakening mechanisms in gypsum interlayers in corrosive environments. Journal of Natural Gas Science and Engineering, v. 26, p. 356–366, 2015. https://doi.org/10.1016/j.jngse.2015.06.027

MIRANDA, D. Cronoanálise e o lean manufacturing. Artigo diretório de artigos gratuitos. 2009.

MOREIRA, D. A. Administração de produção e operações. São Paulo: Pioneira, 2004.

MUNHOZ, F. C.; RENÓFIO, A. Uso da Gipsita na Construção Civil e Adequação para a P+L. In: XIII SIMPEP - Bauru, SP, Brasil. Anais... SIMPEP, SP, 2006. Disponível em: <http://www.simpep.feb.unesp.br/anais/anais_13/artigos/761.pdf> Acesso em: 02 jul. 2018.

OHNO, T. O sistema Toyota de produção: além da produção em larga escala. Porto Alegre: BOOKMAN, 2004.

ORIBE, Y. C.; OLIVERA NETO, G.; MORAIS, M. L.; MAGALHÃES, V. F. Avaliação da capacidade de produção cronoanalise industrial. Qualypro, 2008.

PACHECO, D. A. J. Teoria das restrições, lean manufacturing e seis sigma: limites e possibilidades de integração. Production, v. 24, n. 4, p. 940-956, 2014. https://doi.org/10.1590/S0103-65132014005000002

PEINALDO, J.; GRAEML, A. R. Administração da produção: operações industriais e de serviços. Curitiba: Editora UnicenP, 2007.

PERES, L; BENACHOUR, M.; SANTOS, V. A. O gesso: produção e utilização na construção civil. Recife: Bagaço, 2008.

PIERCY, N.; RICH, N. The relationship between lean operations and sustainable operations. International Journal of Operations & Production Management, v. 35, n. 2, p. 282-315, 2015. https://doi.org/10.1108/IJOPM-03-2014-0143

RAHANI, A.R.; AL-ASHRAF, M. Production flow analysis through value stream mapping: a lean manufacturing process case study. Procedia Engineering. v. 41, p. 1727-1734, 2012. https://doi.org/10.1016/j.proeng.2012.07.375

REZENDE, P. A.; MARTINS, T. L. R.; ROCHA, M. F. Aplicação do estudo de tempos e movimentos no setor administrativo: estudo de caso em uma empresa mineradora. Revista Eletrônica Produção & Engenharia, v. 8, n. 1, p.653-665, 2016. https://doi.org/10.18407/issn.1983-9952.2016.v8.n1.p653-665

ROTHER, M.; SHOOK, J. Aprendendo a enxergar: Mapeando o fluxo de valor para agregar valor e eliminar o desperdício. São Paulo: Lean Enterprise Institute, 2003.

SALGADO, E. G.; MELLO, C. H. P.; SILVA, E. S.; OLIVEIRA, E. S.; ALMEIDA, D. A. Análise da aplicação do mapeamento do fluxo de valor na identificação de desperdícios do processo de desenvolvimento de produtos. Gestão e Produção, v. 16, n. 3, p. 344-356, 2009. https://doi.org/10.1590/S0104-530X2009000300003

SANTOS, P. V. S.; ARAÚJO, M. A. Aplicação de ferramentas lean no setor de logística: um estudo de caso. Revista Gestão em Análise, v. 7, n. 2, p. 168-183, 2018. https://doi.org/10.12662/2359-618xregea.v7i2.p168-183.2018

SANTOS, P. V. S.; OLIVEIRA, T. C. T. Case study on the application of quality tools in service level management. ITEGAM- Journal of Engineering and Technology for Industrial Applications (ITEGAM-JETIA), v. 5, p. 75-81, 2019.

https://doi.org/10.5935/2447-0228.20190011

SHINGO, S. O Sistema Toyota de produção do ponto de vista da engenharia de produção. 2. ed. Porto Alegre, 1996.

SHIVER, J. M.; EITEL, D.; Optimizing emergency departmentthroughput: Operations management solutions for health care decisionmakers. New York: Taylor & Francis Group. 2010.

SHOU, W.; WANG, J.; WU, P.; WANG, X. ; CHONG, H-Y. A cross-sector review on the use of Value Stream Mapping. International Journal of Production Research, v. 55, n. 13, p. 3906-3928, 2017. https://doi.org/10.1080/00207543.2017.1311031

SILVA, A. V.; COIMBRA, R. R. C. Manual de tempos e métodos: Princípios e técnicas do estudo de tempos. Editora Hemus, 1980.

SINDUSGESSO. Polo gesseiro do Araripe: potencialidades, problemas e soluções. Site institucional. 2019.

SLACK, N.; CHAMBERS, R. J; JOHNSTON, R. Administração da produção. São Paulo: Atlas, 2009.

STEVENSON, W. J. Administração das operações de produção. 6.ed. Rio de Janeiro: LTC, 2001.

TAPPING, D.; SHUKER, T. Value stream management for the lean office: 8 steps to planning, mapping and sustaining lean improvements in administrative areas. New York: Productive Press, 2002. https://doi.org/10.4324/9781482278163

TYAGI, S.; CHOUDHARY, A.; CAI, X.; YANG, K. Value Stream Mapping to reduce the lead-time of a product development process. International Journal of Production Economics, v. 160, p. 202–212, 2015. https://doi.org/10.1016/j.ijpe.2014.11.002

WERKEMA, C. Lean Seis sigma: introdução às ferramentas do Lean Manufacturing. 2. ed.: Elsevier, 2012.

WOMACK, J.; JONES, D. T.; ROOS, D. A máquina que mudou o mundo. São Paulo: Campus, 2004.

XIA, W. SUN, J. Simulation guided value stream mapping and lean improvement: A case study of a tubular machining facility. Journal of Industrial Engineering and Management. p. 456-476, 2013. https://doi.org/10.3926/jiem.532

YUVAMITRA, K.; LEE, J.; DONG, K. Value Stream Mapping of Rope Manufacturing: A Case Study. International Journal of Sustainable Engineering, v. 2017, p. 1-11, 2017. https://doi.org/10.1155/2017/8674187

ZAHRAEE, S. M.; HASHEMI, A.; ABDI, A. A.; SHAHPANAH, A.; ROHANI, J. M. Lean Manufacturing Implementation Through Value Stream Mapping: A Case Study. Jurnal Teknologi, v. 68, n. 3, p.119-124, 2014. https://doi.org/10.11113/jt.v68.2957

Published

2019-12-16

How to Cite

Santos, P. V. S., Ferraz, A. de V., & Castro Silva, A. C. G. (2019). Using the value flow mapping tool (MFV) to identify waste in the production process of a gypsum manufacturing company. Revista Produção Online, 19(4), 1197–1230. https://doi.org/10.14488/1676-1901.v19i4.3310