Evaluation of production capacity in the automotive industry: ntegrating theory of constraints and the global operational efficiency index (IROG)

Authors

  • Mariane Cásseres de Souza UNISINOS - Universidade do Vale do Rio dos Sinos
  • Jéssica Mariella Bauer UNISINOS - Universidade do Vale do Rio dos Sinos http://orcid.org/0000-0002-7363-5926
  • João William Gauze Junior UNISINOS - Universidade do Vale do Rio dos Sinos

DOI:

https://doi.org/10.14488/1676-1901.v18i3.2973

Keywords:

Productive capacity. Theory of Constraints. Indication of Overall Operation Performance.

Abstract

The objective of the present work is to analyze the global efficiency of a manufacturing cell of a Brazilian automotive industry. The specific objectives are: (i) analyze the cycle time per operation in each product, (ii) analyze the operations of the cell versus demand. For this, the capacity management model proposed by Pacheco et al. (2012), which integrates the concepts of Theory of Constraints and Total Productive Maintenance (TPM). The practical application of the model is relevant as the definition of the productive capacity of systems enables better management of resources and capacities, improve production scheduling on the factory floor and meeting the demands imposed by the market. The results obtained allowed to prove the effectiveness of the model. It was possible to determine the capacity of the productive system and the impact on the productive capacity of the whole system, considering the quality nonconformities that occur after the bottleneck of the productive flow. The IROG as a tool makes it possible to take more assertive actions in problem solving, optimization of the use of industrial resources and greater integration between the different areas that encompass manufacturing.

Downloads

Download data is not yet available.

Author Biographies

Mariane Cásseres de Souza, UNISINOS - Universidade do Vale do Rio dos Sinos

Mestre em Engenharia de Produção e Sistemas - UNISINOS

Jéssica Mariella Bauer, UNISINOS - Universidade do Vale do Rio dos Sinos

Graduada em Logística - UNISINOS

Bacharelanda em Administração - UNISINOS

Pós Graduanda em Gestão e Docência no Ensino Superior - ULBRA

Mestre em Engenharia de Produção e Sistemas - UNISINOS

 

João William Gauze Junior, UNISINOS - Universidade do Vale do Rio dos Sinos

Mestre em Engenharia de Produção e Sistemas - UNISINOS

 

References

ANDRADE, J.J.O.; SCHERER C.S. Estudo de Caso da Aplicação do Indicador de Eficiência Global de Equipamentos (OEE) para Diagnóstico e Melhoria de Produtividade em uma Linha de Produção Automotiva. ENEGEP - ENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃO, 29., 2009. Anais... Salvador, BA, 2009.

ANTUNES JR, A. V. ; ALVAREZ, R. ; KLIPPEL, M.; BORTOLOTTO, P.; PELLEGRIN, I. Sistemas de produção: sistemas e práticas para projeto e gestão da produção enxuta. Porto Alegre: Bookman, 2008.

ANTUNES JR, A. V.; KLIPPEL, M. Uma abordagem metodológica para o gerenciamento das restrições dos sitemas produtivos: a gestão sistêmica unificada integrada voltada aos resultados do posto de trabalho, 2012.

ANTUNES, J. et al. Uma revolução na produtividade: a gestão lucrativa dos postos de trabalho. Porto Alegre: Bookman, 2013.

BAUER, J.M.; VARGAS, A.; SELLITTO, M.A. Comparação entre a Teoria das Restrições, a Manufatura Enxuta e a Abordagem Seis Sigma. Revista Linkania Master, v. 5, n. 1, p.170-196, 2015.

CHAKRAVORTY, S. S.; BRIAN ATWATER, J. Bottleneck management: theory and

practice. Production, Planning & Control, v. 17, n. 5, p. 441-447, 2006.

CHISTÉ, M. A Influência do IROG na Gestão e Melhoria Contínua dos Equipamentos e Processos: Estudo de Caso em uma Célula de Manufatura na Empresa Master Sistemas Automotivos Ltda. Revista Global Manager Acadêmica, v. 1, n. 1, 2012.

CONBOY, K. Agility from first principles: reconstructing the concept of agility in information systems development, Information Systems Research, v.20, n.3, p.329–354, 2009.

CORBETT NETO, T. Contabilidade de ganhos: a nova contabilidade gerencial de acordo com a Teoria das restrições. São Paulo: Nobel, 1997.

COX, J; SPENCER, M. Manual da teoria das restrições. Porto Alegre: Bookman, 2002.

GHINATO, P. Sistema Toyota de produção: mais do que simplesmente just-in-time. Caxias do Sul: Editora da Universidade de Caxias do Sul, 1996.

GOLDRATT, E M. & COX, J.F. A meta. 1. ed. São Paulo SP: Nobel, 1984.

GOLDRATT, E. M. A síndrome do palheiro: garimpando informações num oceano de dados. São Paulo: Editora Educator, 1996.

GOLDRATT, E. M.; FOX, R. E. A Corrida pela vantagem competitiva. São Paulo: Editora Educador, 1989.

GUERREIRO, Reinaldo. Os princípios da teoria das restrições sob a ótica da mensuraçào econômica. Caderno de Estudos, n. 13, p. 01-10, 1996.

HANSEN, R. C. Overall equipment effectiveness: a powerful production/maintenance tool for increased profits. New York: Industrial Press, 2002.

HAYES, R. P. G.; UPTON, D.; WHELLWRIGHT, S. Produção, estratégia e tecnologia: em busca da vantagem competitiva. Porto Alegre: Bookman, 2008.

HOPP, W.; M. L. SPEARMAN. Factory physics. Boston: Irwin, 2001.

JEONG, K. Y.; PHILLIPS, D.T. Operational efficiency and effectiveness measurement. International Journal of Operation & Production Management, v. 21, p. 1404–1416, 2001.

LIKER, J.,; MEIER, D. Modelo Toyota - manual de aplicação: um guia prático para a implementação dos 4Ps da Toyota, 2007. Porto Alegre: Bookman.

LUCHESE, J.; BAUER, J.M.; VARGAS, A.; SAUERESSIG, G.; DE SOUZA, M.. SELLITTO, M.A. Implantação da Lógica Tambor-Pulmão-Corda em uma Empresa da Indústria Moveleira. Holos, v. 8, n.31, p.262-276, 2016.

MONDEN, Y. The Toyota production system, Productivity Press, Portland, OR. 1983.

NAKAJIMA, S. TPM development program: implementing total productive maintenance. Productivity Press, Cambridge. Massachusetts, 1989.

NOREEN, E.; SMITH, D.; MACKEY, J. T. A Teoria das Restrições e suas Implicações na Contabilidade Gerencial: um relatório independente. São Paulo: Educator, 1996.

OHNO, T. O sistema Toyota de produção: além da produção em larga escala. Porto Alegre: Bookman, 1997.

OHNO, T. The Toyota production system: Beyond Large-Scale Production, Productivity Press, Portland, OR.1988.

OLIVEIRA, J. C. A; KLIPPEL, A. F. Aumento da eficiência operacional através da abordagem de Gestão dos Postos de Trabalho (GPT): um estudo de caso na indústria de medicamentos. In: ENEGEP - ENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃO, 24., 2004. Anais... Florianópolis, SC, 2004.

PACHECO, D. A. J; ANTUNES JR., J.A.V; LACERDA, D. P; GOLDMEYER, D. B; GILSA, C. V; Modelo de Gerenciamento da Capacidade Produtiva: Integrando Teoria das Restrições e o Índice de Rendimento Operacional Global (IROG). Revista Produção Online, v.12, n. 3, p. 806-826, 2012.

PRATES, C.C.; BANDEIRA, D. Aumento de eficiência por meio do mapeamento do fluxo de produção e aplicação do Índice de Rendimento Operacional Global no processo produtivo de uma empresa de componentes eletrônicos. Revista Gestão & Produção, v. 18, n. 4, p. 705-718, 2011.

ROSE, E.; ODOM, R.; DUMBAR, R.; HINCHMAN, J. How TOC & TPM work together to build the quality toolbox of SDWTs. In: Electronics manufacturing technology symposium, manufacturing technologies - present and future, Seventeenth IEEE/CPMT International, Austin, TX , USA, 56-59, 1995.

SILVEIRA JUNIOR, R.J.A.; NUNES, F.L. O Índice de Rendimento Operacional Global e a Troca Rápida de Ferramentas Aliadas à Eficiência de uma Aplicadora de Adesivos. ENEGEP- ENCONTRO NACIONAL DE ENGENHARIA DE PRODUÇÃO, 35., 2015. Anais... Fortaleza, CE, 2015.

SINGH, B., GARG, S. K., SHARMA, S. K., GREWAL, C. Lean implementation and its benefits to production industry, International Journal of Lean Six Sigma, v.1, n.2, p.157-168. 2010.

SOARES, I.H.L.; ARMOND-DE-MELO, D.R.; LEOPOLDINO, C.B.; ABREU, J.C.A.; MOITA, F.M. A Teoria das Restrições em um Processo de Fabricação da Indústria na Construção Civil: Um Estudo de Caso. Revista de Administração da UFSM, v. 2, n. 3, p. 463-478, 2009.

SOUZA, A.A.C. Aplicação da metodologia Tambor – Pulmão – Corda (TPC) com supermercado na gestão de manufatura de eletrodos de grafite das unidades de Candeias e Monterrey da Graftech International Ltd.112 f.2006. Dissertação (Mestrado em Administração), Escola de Administração, Universidade Federal da Bahia, UFBA, Bahia, BA, 2006.

SRINIVASAN, M. M.; JONES, D.; MILLER, A. Applying the theory of constraints principles and lean thinking at the marine corps maintenance center, Defense Acquisition Review Journal, 2004.

TELLES, M. A; PEREIRA, A. S; SEVERO, E. A; GUIMARÃES, S. C. F. Aplicação da Ferramenta IROG: Estudo de caso em uma empresa do ramo de autopeças em Caxias do Sul. Revista Global Manager, v. 14, n. 1, p. 74-92, 2014.

VEIT, D. R; GONCALVES, T; LACERDA, D. P; POSSEBON, A. P. Repercussões dos problemas conceituais do cálculo do IROG: Um estudo de caso sobre adoção de um software na indústria de transformados Termoplásticos. In: ENEGEP - Encontro Nacional de Engenharia de Produção, 32., 2011. Anais..., Belo Horizonte, MG, 2011.

WATSON, K. J.; PATTI, A. A comparison of JIT and TOC buffering philosophies on system performance with unplanned machine downtime, International Journal of Production Research, v. 46, n. 7, p. 1869-85. 2008.

YIN, R. Estudo de caso: planejamento e métodos. Porto Alegre: Bookman, 2005.

Published

2018-09-15

How to Cite

de Souza, M. C., Bauer, J. M., & Gauze Junior, J. W. (2018). Evaluation of production capacity in the automotive industry: ntegrating theory of constraints and the global operational efficiency index (IROG). Revista Produção Online, 18(3), 826–849. https://doi.org/10.14488/1676-1901.v18i3.2973

Issue

Section

Papers