Evaluating the presence of alternative resources in process planning to improve the performance of manufacturing systems
DOI:
https://doi.org/10.14488/1676-1901.v14i2.1467Keywords:
Process Plans with Alternatives. Production Management. Simulation. Production Bottlenecks.Abstract
Usually the process plans are generated without considering the use of alternative machines, i.e., in conventional process planning a single machine is selected for the execution of a particular operation. Consequently, the machines that are preferred by process planners are selected to perform most tasks, leading to the formation of bottlenecks in production. In this context, the inclusion of alternative machines in process plans can be used as a strategy to solve the bottleneck formation problem, since the possible unavailability of a machine allows another preplanned machine to be selected and used immediately. In order to evaluate this proposal, a model was developed to simulate a manufacturing system subject to both types of process plans, i.e., with or without alternative machines. It was found that the inclusion of alternative machines for plans process results in improved performance of the manufacturing system with regard to productivity, work-in-process, and machine utilization, even if the selected alternate machine has lower efficiency.Downloads
Published
How to Cite
Issue
Section
License
The Journal reserves the right to make spelling and grammatical changes, aiming to keep a default language, respecting, however, the style of the authors.
The published work is responsibility of the (s) author (s), while the Revista Produção Online is only responsible for the evaluation of the paper. The Revista Produção Online is not responsible for any violations of Law No. 9.610 / 1998, the Copyright Act.
The journal allows the authors to keep the copyright of accepted articles, without restrictions
This work is licensed under a Creative Commons License .